The One
at Jumeirah Village Triangle
Introducing The One at Jumeirah Village Triangle, The First Group’s latest prestigious development located in the heart of the vibrant district of Jumeirah Village. The exciting, four-star, upper-midscale hotel is centrally located providing convenient access to New Dubai’s many attractions including Expo City Dubai, which is located just 15-minutes away by car. Dubai World Central, which is destined to become the world’s largest air hub, is also just a short drive from the hotel, making it perfectly positioned to enjoy strong and consistent occupancy rates while delivering outstanding returns to owners.
Guests will look forward to being pampered at The One at Jumeirah Village Triangle’s luxury spa, which will feature multiple treatment rooms and a range of indulgent treatments. The facility will also feature a fully-equipped, ultra-modern gymnasium.
Despite being in the final stages of development, The One at Jumeirah Village has already been recognised by the industry, receiving the Best New Hotel Design & Construction award at the Arabian Property Awards. We predict this will be the first of many honours for this stunning development.
AWARD WINNER
‘Best New Hotel Design & Construction’ - Arabian Property Awards
STUNNING FACILITIES
Luxury spa and VIP Lounge
TOP 5
Jumeirah Village: one of Dubai’s top 5 property investment destinations (Mo’Asher, 2022).
VIRTUAL TOUR: THE ONE AT JVT
Take a look at how this iconic hotel located in the heart of Jumeirah Village Triangle will look upon completion.
FACILITIES
24-hour Reception
24/7 reception and concierge services
Valet Parking
Complimentary valet parking service
Business Lounge
Modern, high-tech facilities for business guests
Laundry Service
24/7 laundry service
Wi-Fi
Complimentary high-speed internet access
World-class Dining Facilities
A fine selection of restaurants, cafes and bars
Swimming Pool
Stunning rooftop swimming pool and sundeck
Gymnasium
Fully-equipped fitness centre
Satellite Television
Local and international digital channels
Booking Facilities
Tour and leisure activity booking services
Gallery
Project Development Progress
Progress Updates
The preliminary design approval has obtained from Nakheel and Trakhees.
The shoring permit has been issued.
Zetas have been appointed as the shoring contractor.
Zetas have applied for the required NOCs so they can commence with the shoring works soon; we are expecting to break the ground before the end of March, 2016.
Studio HBA have been appointed as the interior design consultant of the project.
Progress Updates
The preliminary design approval has obtained from Nakheel and Trakhees.
The shoring permit has been issued.
Zetas the shoring contractor has optioned the mobilization permit.
The shoring contractor is expected to commence with the work by the middle of April, 2016.
Studio HBA the appointed interior design consultant has started with the standard and VIP rooms initial design layout.
Progress Updates
The shoring permit has been issued.
Zetas the shoring contractor has commenced with the shoring work.
Studio HBA the appointed interior design consultant has issued the concept interior designs for the standard and VIP rooms for our review.
Progress Updates
The shoring contractor has completed his mobilization to the site.
The shoring contractor has completed 40% of the shoring works.
The project’s consultant will submit the final design drawings to the authorities by the second week of July, 2016 for obtaining the required main building permit.
Standard rooms and suite’s interior designs have been prepared by Studio HBA the hotel’s interior designer consultant and shall be reviewed with the operator during the upcoming workshop session in June, 2016.
Main lobby, common areas and BOH designs are under developing by Studio HBA and will be ready for the operator’s review one by one starting from July, 2016.
Progress Updates
The shoring contractor has completed his mobilization to the site.
The shoring contractor has completed 60% of the shoring works.
The project’s consultant will submit the final design drawings to the authorities by the second week of July, 2016, for obtaining the required main building permit.
Standard rooms and suite’s interior designs have been prepared by Studio HBA the hotel’s interior designer consultant and shall be reviewed with the operator during the next workshop session in July, 2016.
Main lobby, common areas and BOH designs are under developing by Studio HBA and will be ready for the operator’s review, one by one, starting from August, 2016.
Progress Updates
The shoring contractor has completed 90% of the shoring works.
The piling work will commence as soon as the shoring works are completed and that is expected to be during the last week of August, 2016.
The final design drawings have been approved by the authorities.
Standard rooms and suite’s interior designs which have been prepared by Studio HBA the hotel’s interior designer consultant have been reviewed with the operator; minor comments were received. Studio HBA will be addressing these comments in the next workshop session.
Main lobby, common areas and BOH designs are under developing by Studio HBA and will be ready for the operator’s review, one by one, starting from August, 2016.
Progress Updates
Zetas have been awarded the piling works package.
Zetas have commenced with the site mobilization.
Zetas have submitted the piling design to Trakhees for their final review and issuance of the piling permit.
The project’s consultant will submit the full detailed design drawings on the 2nd week of October, 2016.
Standard rooms and suite’s interior designs design drawings have been amended by Studio HBA the hotel’s interior designer consultant as per the operator’s comments.
We have received the operator’s comments on the floors plans, BOH and FOH areas and passed on to the project’s architect and kitchen consultant for their action.
SHBA, the project’s interior design consultant will resume work on common areas, Main lobby, F&B areas on 3rd week of September once the final plans are signed off by the operator.
Progress Updates
Zetas have completed the site mobilization.
Zetas have submitted the piling design to Trakhees for their final review and issuance of the piling permit which is expected by the first week of October, 2016.
The project’s consultant will submit the full detailed design drawings on the 2nd week of October, 2016.
Standard rooms and suite’s interior designs design drawings have been amended by Studio HBA the hotel’s interior designer consultant as per the operator’s comments.
After receiving the operator’s comments on the floors plans, BOH and FOH areas the project’s architect and kitchen consultant have incorporated those comments and reissued the drawings for the operator’s review.
SHBA, the project’s interior design consultant will resume working on common areas, Main lobby, F&B as soon as the final plans are signed off by the operator.
Progress Updates
Zetas have commenced with the piling works after obtaining the piling permit from the relevant authorities.
The project’s consultant has submitted the full detailed design drawings to the authorities for their review and comments if any prior to the issuance of the main building permit.
Standard rooms and suite’s interior designs design drawings have been amended by Studio HBA the hotel’s interior designer consultant as per the operator’s comments.
The operator has signed off on the floors plans, BOH and FOH areas after the project’s architect and kitchen consultant incorporated the operator’s comments and reissued the revised drawings for review.
SHBA, the project’s interior design consultant has resumed working on common areas, Main lobby and F&B areas.
Progress Updates
Standard rooms and suite’s interior designs design drawings have been completed and issued to the operator for his final review.
The operator has signed off on the floors plans, BOH and FOH areas.
The First Group interior design team and SHBA, the project’s interior design consultant are working on common areas, main lobby and F&B areas.
Progress Updates
The operator has highlighted a couple of comments on the interior design of the Standard rooms and suite’s interior designs. The First Group interior design team is working to incorporate those comments.
The operator has signed off on the floors plans, BOH and FOH areas.
The First Group interior design team is working on the design of the common areas, main lobby and F&B areas.
Progress Updates
The First Group interior design team has incorporated the operator’s comments on the standard room design and issued the drawings for the operator’s final review and approval.
The operator has signed off on the floors plans, BOH and FOH areas.
The First Group interior design team is working on the design of the common areas, main lobby and F&B areas along with our food and beverage consultant.
The main building contract package will be awarded by the end of February, 2017.
Progress Updates
The piling contractor has commenced with the testing of the piles.
The dewatering system has been fully installed and is operational.
The operator has approved the standard and VIP’s rooms design layouts.
The operator has signed off on the floors plans, BOH and FOH areas.
The First Group interior design team is working on the design of the common areas, main lobby and F&B areas along with our food and beverage consultant.
The main building contract package will be awarded during the month of March, 2017.
Progress Updates
The piling contractor will complete the testing of all the piles by the 15th of April, 2017.
The dewatering system has been fully installed and is operational.
The contractor for the main building package has been appointed. The contractor will commence with his mobilization to the site as soon as all the necessary permits are obtained.
The operator has approved the standard and VIP’s rooms design layouts.
The operator has signed off on the floors plans, BOH and FOH areas.
The First Group interior design team has completed the design of the common areas and handed it over to the operator for his review and comments.
The main lobby and F&B areas designs are still under preparation by The First Group interior design team along with our food and beverage consultant.
Progress Updates
The main building permit has been obtained.
The contractor has applied for the required No Objection Certificates from the relevant authorities.
The dewatering system has been fully installed and is operational.
The contractor has commenced with his mobilization to the site.
The First Group interior design team is working on the minor comments received from the operator on the design of the common areas.
The main lobby and F&B areas designs are still under preparation by The First Group interior design team along with our food and beverage consultant.
Progress Updates
The contractor has obtained the construction No Objection Certificates from the relevant authorities.
The contractor has completed his mobilization to the site.
The First Group’s interior design team has completed dealing with the minor comments received from the operator on the design of the common areas and reissued the drawings to the operator for his final review and signoff.
The main lobby and F&B areas designs are still under preparation by The First Group interior design team along with our food and beverage consultant.
Progress Updates
The contractor has commenced with the foundation work preparation.
The contractor has commenced with the Gunite work for the shoring walls.
The First Group’s interior design team has received the operator’s approval on the design of the common areas.
The First Group interior design team along with our food and beverage consultant is having regular workshop sessions with the operator with regard to the design of the main lobby and F&B areas.
Progress Updates
All the plies have been tested and approved by the consultant.
The contractor has commenced with the pile cap works. This is part of the foundation work preparation.
The contractor has completed 70% of the Gunite work for the shoring walls.
The First Group’s interior design team is preparing the detailed design drawings for the common areas based on the approval obtained from the operator.
The First Group interior design team along with our food and beverage consultant is in the final stage of presenting the design concept of the main lobby and F&B areas to the operator based on the work sessions held earlier for the same areas.
Progress Updates
70% of the pile cap work has been completed.
The contractor is planning to cast the raft foundation slab by the end of September, 2017.
The First Group’s interior design team has prepared the detailed design drawings for the common areas based on the approval obtained from the operator.
The First Group interior design team along with our food and beverage consultant has presented the design concept of the main lobby and F&B areas to the operator which was largely liked by the operator.
Progress Updates
90% of the pile cap work has been completed.
The contractor has cast the first part of the raft including the lifts pit.
The final part of the raft foundation will be cast by the 15th of October, 2017.
The First Group’s interior design team has forward the approved drawings of the common areas to the contractor for his information and action.
The First Group interior design team is preparing the design drawings for the main lobby and F&B areas based on the operator approval.
Progress Updates
The raft foundation was cast on the 20th of October, 2017.
The contractor is working on the preparation of the basement slab.
The First Group’s interior design team is having regular workshop sessions with the contractor and the operator on the design of the common areas.
The First Group interior design team has completed 50% of the required design drawings for the main lobby and F&B areas based on the operator approval.
Progress Updates
The contractor is planning to cast the basement slab by the end of December 2017.
The First Group’s interior design team has submitted the concept design of the common areas to the operator for their review.
The First Group interior design team has completed 70% of the required design drawings for the main lobby and F&B areas based on the operator approval.
Progress Updates
The contractor is planning to cast the ground floor slab on the 10th of Jan, 2018.
The contractor is targeting to also cast the first floor slab by the end of Jan, 2018.
The First Group’s interior design team and the operator’s team are having regular working session to review the concept design of the common areas.
The First Group interior design team has completed 85% of the required design drawings for the main lobby and F&B areas based on the operator approval.
Progress Updates
The ground floor slab cast has been completed.
The main part of the 1st floor slab will be cast on the 15th of February, 2018.
The First Group’s interior design team and the operator’s team have reviewed and approved the concept design of the common areas.
The First Group interior design team has completed the design drawings for the main lobby and F&B areas based on the operator approval.
Progress Updates
The main part of the 1st floor slab has been completed. The full slab will be completed during the first week of March, 2018.
The First Group’s interior design team is preparing the detailed Interior Design drawings for the common areas based on the design approved by the operator.
The First Group interior design team is finalization the election of the finishing materials for the main lobby and F&B areas based on the operator’s design approval.
Progress Updates
The 2nd floor slab has been completed.
The 3rd floor slab will be completed during the second week of April, 2018.
The First Group’s interior design team has completed 70% of the detailed Interior Design drawings for the common areas.
The First Group interior design team will present during the month of April, 2018 to the operator the selected finishing materials for the main lobby and F&B areas.
Progress Updates
The 4th podium floor slab has been completed.
The 5th podium floor slab will be completed during the second week of May 2018.
The First Group’s interior design team has completed 85% of the detailed Interior Design drawings for the common areas.
The First Group interior design team has presented to the operator the selected finishing materials for the main lobby and F&B areas.
Progress Updates
The 4th podium floor slab has been completed.
The 5th podium floor slab will be completed during the second week of May 2018.
The First Group’s interior design team has completed 85% of the detailed Interior Design drawings for the common areas.
The First Group interior design team has presented to the operator the selected finishing materials for the main lobby and F&B areas.
Progress Updates
The 5th podium floor slab has been completed.
The first typical floor slab will be completed during the second week of July 2018.
The First Group’s interior design team has completed the detailed Interior Design drawings for the common areas and submitted them to the operator for their review.
The First Group interior design team has obtained from the operator approval for the selected finishing materials for the main lobby and associated F&B areas.
The First Group’s interior design team has forwarded the main lobby and front and back of house areas fit out packages to the specialized contractors for pricing.
The First Group’s interior design team has completed the design of the final F&B outlet located on two of the upper floors and has submitted it to the operator for their review.
Progress Updates
The 7th floor slab (First typical guest room floor slab) has been completed.
The second typical floor slab will be completed during the first week of August 2018.
The First Group’s interior design team has received the approval from the operator on the detailed Interior Design drawings for the common areas.
The First Group’s interior design team is having regular workshop sessions with the fit out contractors who have bid for the main lobby and the front and back of house areas to ensure they have a full understanding of the design elements and the scope of works required.
The First Group’s interior design team has obtained the operator’s approval for the design of the final F&B outlet located on two of the upper floors.
Progress Updates
The 9th floor slab (3rd typical guest room floor slab) has been completed.
The 4th typical floor slab will be completed during the first week of September 2018.
The First Group’s interior design team has commenced with the preparation of the detailed drawings for the common areas and the F&B outlet located on two of the upper floors after receiving the operator approval on the design of those areas.
The First Group’s interior design team has floated the fit-out tender for the main lobby and the front and back of house areas.
Progress Updates
The 11th floor slab (5th typical guest room floor slab) has been completed.
The 6th typical floor slab will be completed during the first week of October 2018.
The First Group’s interior design team has prepared the first set of detailed drawings for the common areas and the F&B outlet located on two of the upper floors.
The First Group’s interior design team has received the bids for the fit-out tender for the main lobby and the front and back of house areas. The offers received are currently being evaluated.
Progress Updates
The 13th floor slab (7th typical guest room floor slab) has been completed.
The 8th typical floor slab will be completed during the second week of November 2018.
The First Group’s interior design team is working on the preparation of the second set of detailed drawings for the common areas and the F&B outlet located on two of the upper floors.
The First Group’s interior design team is enhancing the design of some areas around the main lobby and the front and back of house areas based on the ongoing workshop sessions with the operator and the kitchen consultant.
Progress Updates
The 14th floor slab (8th typical guest room floor slab) has been completed.
The 15th floor slab is expected to be cast during December 2018
Block work is progressing on B1, G, P1, P2, P3, P4, P5 and T2-T6
Plaster is progressing B1, G, P1, P2, and P3, P4
The First Group’s interior design team has completed the second set of the detailed drawings for the common areas. The F&B outlet drawings are still in progress.
The First Group’s interior design team has sent the latest version of the design of some areas around the main lobby and the front and back of house areas to the operator for their final review.
Progress Updates
14th floor slab (8th guestroom floor) was cast on 08/12/18.
15th floor slab (9th guestroom floor) was cast on 20/12/18.
16th floor slab (10th guestroom floor) is expected to be cast on 03/01/119
Block work is progressing on B1, G, P1, P2, P3, P4, P5 and T2-T12
Plaster is progressing on B1, G, P1, P2, P3, P4, and T2-T4
The First Group’s interior design team has completed the second set of all common area drawings and the preliminary design for all F&B outlets.
The First Group’s interior design team has received feedback from the operator on all front and back of house areas. The final changes necessary are already being implemented on site.
Progress Updates
19th floor slab (14th guestroom floor) was cast on 28/02/19.
20th floor slab (15th guestroom floor) will be cast on 8/03/19.
Block work is progressing on G, P1, P2, P3, P4, P5 and T2-T14
Plaster is progressing on G, P1, P2, P3, P4, and T2-T7
The First Group’s interior design team has received the operator’s comments on the final set of all the common area drawings and on the preliminary designs for all the F&B outlets and we have started the implementation of these comments.
The contractor is working on the execution of the comments raised by the operator on all front and back of house areas under the supervision of the project’s consultant and The First Group team.
Progress Updates
22nd floor slab (17th guestroom floor) was cast on 25/03/19.
23rd floor slab (18th guestroom floor) will be cast on 07/04/19.
Block work is in progress up to 15th typical floor.
Plaster work is in progress up to the 8th typical floor.
The First Group’s interior design team has incorporated the operator’s comments on the final set of all the common area drawings and on the preliminary designs for all the F&B outlets and sent them for the operator’s final review.
The contractor has completed its work on 40% of the comments raised by the operator on all front and back of house areas under the supervision of the project’s consultant and The First Group team
Progress Updates
25th floor slab (20th guestroom floor) was cast on 29th April 2019
26th floor slab (21st guestroom floor) will be cast on 7th May 2019
Block work is in progress up to 18th typical floor
Plaster work is in progress up to the 10th typical floor
Curtain wall work is ongoing
After receiving the operator’s approval for the concept design proposals The First Group’s interior design team has started the preparation of the detailed design drawings for all the common areas and the F&B outlets
The contractor has completed work on the majority of the comments raised by the operator on the various front and back of house areas, all under the supervision of the project consultant and The First Group team
Progress Updates
26th floor slab (21st guestroom floor) was cast on 19/05/19.
27th floor slab (22nd guestroom floor) was cast on 09/06/19.
Block work is in progress up to 19th typical floor.
Plaster work is in progress up to the 11th typical floor.
Curtain wall work is ongoing.
Sub structure is 100% complete with super structure at 84% complete.
The First Group’s interior design team is preparing the detailed design drawings for all the common areas and the F&B outlets, based on the operator having approved the concept designs for these areas.
The operator is now reviewing the final set of drawings prepared by The First Group for the various front and back of house areas.
Progress Updates
28th floor slab (23rd guestroom floor) was cast on 30/06/19.
29th floor slab (23rd guestroom floor) will be cast on 11/07/19.
Block work is in progress up to the 20th typical floor.
Plaster work is in progress up to the 12th typical floor.
Curtain wall work is ongoing.
The First Group’s interior design team has completed the first set of the detailed design drawings for all the common areas and the F&B outlets.
The operator only had a few minor comments after reviewing the final set of drawings prepared which had been prepared by The First Group interior design team and the kitchen consultant, for the various front and back of house areas. These are being addressed.
Progress Updates
30th floor slab (25th guestroom floor) was cast on 30/07/19.
31st floor slab (26th guestroom floor) will be cast on 10/08/19.
Block work is in progress up to the 21st typical floor.
Plaster work is in progress up to the 13th typical floor.
Curtain wall work is ongoing.
The First Group’s interior design team has completed the first set of the detailed design drawings for all the common areas and the F&B outlets.
The operator only had a few minor comments after reviewing the final set of drawings which had been prepared by The First Group’s interior design team and the kitchen consultant, for the various front and back of house areas. These are being addressed.
Progress Updates
31st floor slab (26th guestroom floor) was cast on 24/08/19.
32nd floor slab (27th restaurant floor) will be cast on 10/09/19.
The roof slab (final slab) will be cast on 30/09/2019. This will be the completion of the super structure of the building.
Block work is in progress up to the 28th typical floor.
Plaster work is in progress up to the 15th typical floor.
Curtain wall work is ongoing.
The First Group’s interior design team has submitted the final detailed design drawings of the F&B outlets and the corridors to the operator for their review.
The First Group’s interior design team has issued the revised drawings for the various front and back of house areas after addressing the operator’s earlier comments.
Progress Updates
The roof slab (final slab) will be cast on 5th of October 2019. This will represent the completion of the super structure of the building.
Block work is in progress up to the 29th typical floor.
Plaster work is in progress up to the 16th typical floor.
Curtain wall work is ongoing.
The operator is having regular sessions with The First Group’s interior design team discussing the final detailed design drawings of the F&B outlets and the corridors.
The First Group’s interior design team has received the operator’s approval of the revised drawings for the various front and back of house areas.
Progress Updates
The roof slab (final slab) will be cast on 5th of November 2019. This will represent the completion of the super structure of the building.
Block work is in progress up to the 29th typical floor.
Plaster work is in progress up to the 17th typical floor.
Curtain wall work is ongoing.
The First Group’s interior design team is working closely with the operator on the various potential detailed design proposals for the F&B outlets and the corridors.
The First Group’s interior design team has prepared the 1st set of drawings for the various front and back of house areas which have been sent to the contractor for implementation.
Progress Updates
The super structure of the building has been completed.
Block work is in progress up to the 30th typical floor.
Plaster work is in progress up to the 19th typical floor.
Curtain wall work is ongoing.
The First Group’s interior design team has submitted two design proposals for the F&B outlets and the corridors to the operator for their review.
The First Group’s interior design team has prepared the second set of drawings for the various front and back of house areas which have been sent to the contractor for implementation.
Progress Updates
Blockwork is in progress up to the 30th typical floor and the restaurant area on the 31st floor.
Plasterwork is in progress up to the 21st typical floor.
Curtain wall work is ongoing.
The First Group’s interior design team has received the operator comments on the two design proposals for the F&B outlets and the corridors which were submitted earlier.
The First Group’s interior design team has prepared the 3rd and final set of drawings for the various front and back of house areas. The contractor received these drawings and commenced with the work accordingly.
Progress Updates
Blockwork is in progress up to the restaurant area on the 31st floor and the roof floor.
Plasterwork is in progress up to the 23rd typical floor.
Curtain wall work is ongoing.
The First Group’s interior design team has incorporated the operator’s comments on the two design proposals for the F&B outlets and the corridors and resubmitted both designs to the operator for their final review.
The First Group’s interior design team has submitted the complete set of drawings for the various front and back of house areas to the contractor.
Progress Updates
Blockwork has been completed.
Plasterwork is in progress up to the 24th typical floor.
Curtain wall work is ongoing.
The operator has approved the two design proposals for the F&B outlets and the corridors, which were proposed by The First Group's interior design team.
Progress Updates
MEP's work is ongoing up to the 27th
Plasterwork is in progress up to the 25th typical floor.
The tiling work is in progress up to the 20th typical floor.
Curtain wall work is ongoing.
The First Group's interior design team has completed 30% of the detailed design drawings for the F&B outlets and the corridors, which were approved earlier by the operator.
Progress Updates
After obtaining all the required authorities' approvals issued in the name of the newly appointed contractor, the work resumed at the site in full capacity.
The First Group's interior design team has completed 70% of the detailed design drawings for the F&B outlets and the corridors, which were approved earlier by the operator.
Progress Updates
MEP's work is ongoing up to the 29th floor.
Plasterwork is in progress up to the 27th typical floor.
The tiling work is in progress up to the 24th typical floor.
Curtain wall work is ongoing.
The First Group's interior design team has completed the detailed design drawings for the F&B outlets and the corridors.
The First Group's interior design team has commenced with the design's renders for F&B outlets and the common areas.
Progress Updates
MEP's work is ongoing at the common areas and corridors.
Plasterwork is in progress up to the 30th typical floor.
The tiling work is in progress up to the 27th typical floor.
Curtain wall work is ongoing. It's expected to be complete by the end of November 2020.
The First Group's interior design team is working on the comments received from the F&B team on the design of the two F&B outlets.
The First Group's interior design team has shared the common areas and corridors' design with the operator for their review.
Progress Updates
MEP's work inside the Guest's room is complete and 80% complete in the common areas and corridors.
Plasterwork has been completed on typical floors.
The tiling work is in progress up to the 30th typical floor.
Curtain wall work is complete. Work is in progress in the area which was occupied by the construction lift.
The VIP mockup guest's room is complete.
The First Group's interior design team completed the comments received from the F&B team on the design of the two F&B outlets and resubmit the design for final review.
The First Group's interior design team received the operator's comments on the common areas and corridors' design.
Progress Updates
MEP's work 90% complete in the common areas and corridors.
Plasterwork is 75% complete on typical floors.
The tiling work is complete.
Curtain wall work is complete.
The fit-out work at the looby area has commenced.
The First Group's interior design team is preparing the tender documents for the hotel's F&B outlets.
The First Group's interior design team has resubmitted the common areas and the corridors' design drawings to the operator after incorporating all of his comments.
Progress Updates
Main construction works completed on - 03 May 2021
MEP's work has been completed inside the Guest's rooms and 95 % complete in the common areas and corridors.
Plasterwork is 100% complete inside the Guest's room's typical floors.
The fit-out work at the lobby area, SPA, and GYM is ongoing.
The First Group's interior design team has tendered the hotel's F&B outlets.
The operator has approved the common areas and the corridors' design submitted by First Group's interior design team.
Progress Updates
Main construction works completed on - 03 May 2021
MEP's work has been completed in the common areas and corridors.
Dubai Civil Defense certificate has been obtained.
Nakheel's compliant certificate has been obtained.
Nakheel's completion certificate is expected by the end of July 2021.
The fit-out work at the lobby, spa, and gym are complete. The snagging work is ongoing.
The First Group's interior design team is evaluating the tenders received for the hotel's F&B outlets.
Progress Updates
Main construction works completed on - 03 May 2021
Nakheel's completion certificate is expected by the end of September 2021.
The snagging work is ongoing.
The new hard landscaping work on the swimming pool area is ongoing.
The First Group's ID team is having workshop sessions with the fit-out contractor, reviewing the final details of the F&B outlets' designs.
Progress Updates
Nakheel's completion certificate has been obtained.
The snagging work is ongoing.
The new hard landscaping work on the swimming pool area is ongoing.
The First Group's ID team is preparing the tender package for the F&B outlets based on the approved designs.
Progress Updates
Nakheel's completion certificate has been obtained.
The snagging work is 75% complete.
The new hard landscaping work on the swimming pool's area is 50% complete.
The final stage of the MEP testing and commissioning is ongoing.
The F&B outlets' tender package is 70% complete.
The Fit-out contractors list has been established for tendering.
Progress Updates
The First Group’s design team is reviewing landscaping layouts for the pool area.
The final stage of MEP testing and commissioning is 70% complete.
The tender package for the hotel’s restaurants is 80% complete.
90% of the snag list is complete.
Progress Updates
The snagging work is 95% complete.
The First Group’s interior design team has highlighted a few improvements on the newly proposed and upgraded landscaping design on the swimming pool area to the landscaping consultant so he would amend the design drawings accordingly.
The final stage of the MEP testing and commissioning is 85% complete.
The F&B outlets' tender package is 90% complete.
The First Group’s interior design team is preparing the guest’s room furniture package and drawings for tendering.
The lobby's fit-out contractor has commenced with the hard finishes and wood cladding elements required in the lobby area.
Progress Updates
The snag list is complete
The landscaping consultant has completed 35% of the designs for the swimming pool area.
The final stage of MEP testing and commissioning is complete.
The tender package for the hotel’s F&B outlets is complete
The First Group’s interior design team has completed 50% of the guestroom furniture tender package.
The lobby fit-out contractor has commenced with the hard finishes and wood-cladding elements required in the lobby area.
Progress Updates
The landscaping consultant has completed 60% of the revised landscaping design drawings around the swimming pool area.
The final stage of the MEP testing and commissioning is complete.
The tender package for the hotel’s F&B venues is complete.
The First Group’s interior design team has completed the guestroom furniture tender package.
The lobby’s fit-out contractor has commenced with the hard finishes and cladding elements required in the lobby area.
The snag list is complete.
Progress Updates
The snag list is complete.
The landscaping consultant has completed 50% of the revised landscaping designs around the swimming pool area.
The final stage of MEP testing and commissioning is complete.
The tender package for the hotel’s F&B venues is complete.
The First Group’s Interior Design team has completed 70% of the guestroom furniture tender package.
The lobby’s fit-out contractor has commenced with the hard finishes and wood cladding elements required in the lobby area.
Progress Updates
December 2022- January 2023 Updates:
The snag list is in progress.
The landscaping consultant has completed 70% of the upgraded landscaping designs around the swimming pool and drop-off areas.
The final stage of MEP testing and commissioning is complete.
The tender package for the F&B outlets is complete, and undergoing technical and commercial evaluation.
The First Group’s Interior Design team has completed 85% of the tender package for the guestroom furniture.
The lobby’s fit-out contractor has completed 60% of the hard furnishings for the hotel lobby area.
Progress Updates
December 2022- January 2023 Updates:
The snag list is in progress.
The landscaping consultant has completed 70% of the upgraded landscaping designs around the swimming pool and drop-off areas.
The final stage of MEP testing and commissioning is complete.
The tender package for the F&B outlets is complete, and undergoing technical and commercial evaluation.
The First Group’s Interior Design team has completed 85% of the tender package for the guestroom furniture.
The lobby’s fit-out contractor has completed 60% of the hard furnishings for the hotel lobby area.
Progress Updates
February - March 2023 Updates:
The de-snagging work is in progress.
The landscaping and hardscape designs are under review by The First Group.
MEP testing and commissioning are complete and under review.
The tender package for the F&B outlets is complete and in the final stage of nomination.
The guestroom furniture tender package is assigned, and the contractor is doing site measurements and preparing the shop drawing.
The lobby’s fit-out contractor has completed 90% of the hard-finish elements in the lobby area.
Fit-out work for the gym, spa and public bathroom areas is 60% complete.
Progress Updates
February - March 2023 Updates:
The de-snagging work is in progress.
The landscaping and hardscape designs are under review by The First Group.
MEP testing and commissioning are complete and under review.
The tender package for the F&B outlets is complete and in the final stage of nomination.
The guestroom furniture tender package is assigned, and the contractor is doing site measurements and preparing the shop drawing.
The lobby’s fit-out contractor has completed 90% of the hard-finish elements in the lobby area.
Fit-out work for the gym, spa and public bathroom areas is 60% complete.
Progress Updates
April - May 2023 Updates:
Verification, troubleshooting and activation of the guestroom management system are ongoing.
The First Group’s Interior Design team is developing the landscaping designs for the GF and Level 1 areas.
MEP systems are undergoing third-party verification.
The fire and life safety third party is confirmed to conduct the Building Audit.
F&B venue packages are under post-tender review before nomination.
The site condition survey for the guestroom furniture package is 70% complete.
The lobby’s fit-out contractor has completed the hard finishes in the lobby area.
Fit-out work for the gym, spa, and public restrooms is 90% complete.
Progress Updates
April - May 2023 Updates:
Verification, troubleshooting and activation of the guestroom management system are ongoing.
The First Group’s Interior Design team is developing the landscaping designs for the GF and Level 1 areas.
MEP systems are undergoing third-party verification.
The fire and life safety third party is confirmed to conduct the Building Audit.
F&B venue packages are under post-tender review before nomination.
The site condition survey for the guestroom furniture package is 70% complete.
The lobby’s fit-out contractor has completed the hard finishes in the lobby area.
Fit-out work for the gym, spa, and public restrooms is 90% complete.
Progress Updates
June - July 2023 Updates:
The guestroom management system is undergoing verification, troubleshooting, and activation.
Landscape designer completed the schematic design stage for GF and level 01
The Fire & Life Safety team has engaged with the MEP contractor to conduct the site survey.
The First Group’s Interior Design team are in continuous workshop session to develop the outlet space concept design with F&B team based on the F&B vision, concept and requirement.
The site condition survey for the guestroom furniture installation is 90% complete.
The fit-out contractor has completed the hardware elements in the lobby area. Work has commenced on the decorative elements.
Hardware elements for Level 5’s fit-out work for the gym, spa and public bathroom is complete. Work has commenced on the decorative elements.
Progress Updates
June - July 2023 Updates:
The guestroom management system is undergoing verification, troubleshooting, and activation.
Landscape designer completed the schematic design stage for GF and level 01
The Fire & Life Safety team has engaged with the MEP contractor to conduct the site survey.
The First Group’s Interior Design team are in continuous workshop session to develop the outlet space concept design with F&B team based on the F&B vision, concept and requirement.
The site condition survey for the guestroom furniture installation is 90% complete.
The fit-out contractor has completed the hardware elements in the lobby area. Work has commenced on the decorative elements.
Hardware elements for Level 5’s fit-out work for the gym, spa and public bathroom is complete. Work has commenced on the decorative elements.
Progress Updates
August - September 2023 Updates:
Verification, troubleshooting, and activation of the guestroom management system are in the process of being finalised.
The landscape designer is finalising the ground floor and level 01 design packages.
The MEP contractor is attending to Fire, Life, and Safety points.
The guestroom furniture contractor has completed the site survey for all guestrooms.
The fit-out contractor has started the decorative elements for the main lobby, public bathroom, and lift lobby on the ground floor.
The fit-out contractor has started with decorative final finish elements for the gym, spa, and public bathroom at level 01.
The MEP team validated CCTV drawings according to SIRA (Security Industry Regulatory Agency) guidelines.
Progress Updates
August - September 2023 Updates:
Verification, troubleshooting, and activation of the guestroom management system are in the process of being finalised.
The landscape designer is finalising the ground floor and level 01 design packages.
The MEP contractor is attending to Fire, Life, and Safety points.
The guestroom furniture contractor has completed the site survey for all guestrooms.
The fit-out contractor has started the decorative elements for the main lobby, public bathroom, and lift lobby on the ground floor.
The fit-out contractor has started with decorative final finish elements for the gym, spa, and public bathroom at level 01.
The MEP team validated CCTV drawings according to SIRA (Security Industry Regulatory Agency) guidelines.
Progress Updates
October - November 2023 Updates:
The configuration and troubleshooting of the guestroom management system is ongoing.
The project consultant is liaising with the hotel operator and contractor to enhance the hotel’s operations and circulation.
FLS System (Fire, Life, and Safety) auditing is ongoing.
The guestroom furniture contractor will commence with the procurement of materials.
The First Group’s interior design team and the guestroom furniture contractor are finalising the design for the VIP Suite.
Fit-out work for the Ground Floor main lobby, public restroom, and lift lobby is 60% complete.
Fit-out work for the gymnasium, spa, and public restroom at Level 5 is 65% complete.
MEP contractors are liaising with SIRA authorities to revalidate CCTV drawings in compliance with regulations.
Progress Updates
October - November 2023 Updates:
The configuration and troubleshooting of the guestroom management system is ongoing.
The project consultant is liaising with the hotel operator and contractor to enhance the hotel’s operations and circulation.
FLS System (Fire, Life, and Safety) auditing is ongoing.
The guestroom furniture contractor will commence with the procurement of materials.
The First Group’s interior design team and the guestroom furniture contractor are finalising the design for the VIP Suite.
Fit-out work for the Ground Floor main lobby, public restroom, and lift lobby is 60% complete.
Fit-out work for the gymnasium, spa, and public restroom at Level 5 is 65% complete.
MEP contractors are liaising with SIRA authorities to revalidate CCTV drawings in compliance with regulations.
Progress Updates
December 2023 - January 2024 Updates:
The project consultant, operator, and contractor are completing the snag list.
The MEP contractor is attending to comments from the Fire, Life, and Safety (FLS) audit.
The furniture contractor has commenced with fabrication of the guestroom furniture.
Fit-out work for the GF main lobby, public bathroom, and lift lobby is 70% complete.
Fit-out work for the gym, spa, and public bathroom at level 5 is 75% complete.
The First Group Interior Design team is developing the design for the typical corridor level.
The project consultant and operator are conducting third-party testing for the building services, including the lifts and Building Maintenance Unit (BMU).
The project consultant is conducting tests and the commissioning of the building façade lighting system.
Progress Updates
December 2023 - January 2024 Updates:
The project consultant, operator, and contractor are completing the snag list.
The MEP contractor is attending to comments from the Fire, Life, and Safety (FLS) audit.
The furniture contractor has commenced with fabrication of the guestroom furniture.
Fit-out work for the GF main lobby, public bathroom, and lift lobby is 70% complete.
Fit-out work for the gym, spa, and public bathroom at level 5 is 75% complete.
The First Group Interior Design team is developing the design for the typical corridor level.
The project consultant and operator are conducting third-party testing for the building services, including the lifts and Building Maintenance Unit (BMU).
The project consultant is conducting tests and the commissioning of the building façade lighting system.
Progress Updates
February 2024 - March 2024 Updates:
The contractor will commence with the decorative painting in the guestrooms before furniture installation.
The MEP contractor and the hotel’s IT team are working on technical requirements.
Subcontractors will commence with wallpaper installation in the guestrooms.
The guestroom furniture contractor is delivering fixed items to the guestrooms.
Ongoing fit-out work at the ground-floor main lobby, public bathroom, and lift lobby is 85% complete.
Fit-out work for the gym, spa, and public bathroom at level 5 is 80% complete.
The First Group Interior Design team is conducting workshops with the hotel operator for the typical corridor design.
Progress Updates
February 2024 - March 2024 Updates:
The contractor will commence with the decorative painting in the guestrooms before furniture installation.
The MEP contractor and the hotel’s IT team are working on technical requirements.
Subcontractors will commence with wallpaper installation in the guestrooms.
The guestroom furniture contractor is delivering fixed items to the guestrooms.
Ongoing fit-out work at the ground-floor main lobby, public bathroom, and lift lobby is 85% complete.
Fit-out work for the gym, spa, and public bathroom at level 5 is 80% complete.
The First Group Interior Design team is conducting workshops with the hotel operator for the typical corridor design.
Progress Updates
April 2024 - May 2024 Updates:
The assembling and installation of the guestroom furniture is 15% complete.
The project consultant and engineering teams are finalising the snag and de-snagging list.
The MEP contractor is attending to the IT requirements for hotel operations.
The final finishes to the fit-out work in the main lobby and public bathroom at GF are in progress.
The final finishes to the fit-out work in the gym, spa, and public bathroom at level 5 are in progress.
The First Group’s procurement team is working with the hotel operator to finalise OS&E items.
The First Group’s interior design team is conducting workshops with the landscaping consultant to enhance the leisure deck area at level 01.
The First Group’s project team is finalising the appointment of the interior design firm for the all-day dining area.
The First Group’s project team is liaising with a specialist to enhance the guest experience and feature elements at the drop-off area.
Progress Updates
April 2024 - May 2024 Updates:
The assembling and installation of the guestroom furniture is 15% complete.
The project consultant and engineering teams are finalising the snag and de-snagging list.
The MEP contractor is attending to the IT requirements for hotel operations.
The final finishes to the fit-out work in the main lobby and public bathroom at GF are in progress.
The final finishes to the fit-out work in the gym, spa, and public bathroom at level 5 are in progress.
The First Group’s procurement team is working with the hotel operator to finalise OS&E items.
The First Group’s interior design team is conducting workshops with the landscaping consultant to enhance the leisure deck area at level 01.
The First Group’s project team is finalising the appointment of the interior design firm for the all-day dining area.
The First Group’s project team is liaising with a specialist to enhance the guest experience and feature elements at the drop-off area.
Progress Updates
June - July 2024 Updates:
Guest room furniture assembly and installation are 55% complete.
Continuous workshops involving the consultant and hotel engineering teams are addressing snagging and de-snagging in rooms, typical corridors, lift lobby, BOH areas, etc.
The MEP contractor's work is ongoing to meet IT requirements for hotel operations.
A fit-out contractor for the kids' play area has been appointed.
Fit-out work for the main lobby and public bathroom on the ground floor is 90% complete.
Fit-out work for the gym, spa, and public bathroom on level 5 is 95% complete.
The First Group's Procurement team has initiated OS&E orders.
The First Group's ID and F&B teams are in continuous workshops finalizing the schematic design stage for the All-Day Dining and Leisure Deck.
A specialist has been appointed by The First Group's project team to enhance the drop area experience.
Progress Updates
June - July 2024 Updates:
Guest room furniture assembly and installation are 55% complete.
Continuous workshops involving the consultant and hotel engineering teams are addressing snagging and de-snagging in rooms, typical corridors, lift lobby, BOH areas, etc.
The MEP contractor's work is ongoing to meet IT requirements for hotel operations.
A fit-out contractor for the kids' play area has been appointed.
Fit-out work for the main lobby and public bathroom on the ground floor is 90% complete.
Fit-out work for the gym, spa, and public bathroom on level 5 is 95% complete.
The First Group's Procurement team has initiated OS&E orders.
The First Group's ID and F&B teams are in continuous workshops finalizing the schematic design stage for the All-Day Dining and Leisure Deck.
A specialist has been appointed by The First Group's project team to enhance the drop area experience.
Progress Updates
August - September 2024 Updates:
Guest room furniture assembly and installation are 90% complete.
Carpet installation in typical corridors is 70% complete.
Ongoing workshops address snagging in guest rooms, corridors, lift lobbies, and BOH areas with the consultant and hotel engineering teams.
MEP contractor is coordinating with the operator to provide IT provisions for hotel operations.
Fit-out work for the kids' play area is complete.
Fit-out work for the main lobby and public bathrooms on the ground floor is complete.
Fit-out work for the gym, spa, and public bathrooms on level 5 is complete.
The First Group's Procurement team has placed orders for hotel kitchen equipment.
The All-Day Dining fit-out contractor has been appointed, with engineering and site surveys in progress.
The installation of the sculpture in the hotel drop-off area is 70% complete.
Ongoing workshops between The First Group's project team and the hotel operator address operational requirements.
Progress Updates
August - September 2024 Updates:
Guest room furniture assembly and installation are 90% complete.
Carpet installation in typical corridors is 70% complete.
Ongoing workshops address snagging in guest rooms, corridors, lift lobbies, and BOH areas with the consultant and hotel engineering teams.
MEP contractor is coordinating with the operator to provide IT provisions for hotel operations.
Fit-out work for the kids' play area is complete.
Fit-out work for the main lobby and public bathrooms on the ground floor is complete.
Fit-out work for the gym, spa, and public bathrooms on level 5 is complete.
The First Group's Procurement team has placed orders for hotel kitchen equipment.
The All-Day Dining fit-out contractor has been appointed, with engineering and site surveys in progress.
The installation of the sculpture in the hotel drop-off area is 70% complete.
Ongoing workshops between The First Group's project team and the hotel operator address operational requirements.
WHY OWN IN JUMEIRAH VILLAGE?
AN IDEAL LOCATION IN A POPULAR AND FAST-GROWING AREA OF DUBAI
Jumeirah Village is one of Dubai’s fastest-growing precincts and is conveniently located close to the Expo City Dubai and Dubai World Central International Airport.